Version 3.3 · Project Discovery

Define the performance outcomes. Engineer the infrastructure.

The Discovery Wizard converts owner priorities, site opportunities, and delivery constraints into structured inputs for the Living Infrastructure Layer™ decision engine.

Step 1 of 5

Project intelligence

PROJECT_CONTEXT

Identify the asset, decision-maker, building function, project phase, and geographic context.

Project identity

Location intelligence

Enter the complete address on one line. Verification fills the coordinates and available location data. Manual fields remain available when lookup is unavailable.

Location has not been verified.

Step 2 of 5

Site analysis

SITE_OPPORTUNITY

Enter the existing site dimensions and conditions. The application calculates open ground, impervious coverage, and preliminary intervention areas.

Site classification

Site area inputs

Enter measured areas. Open ground and impervious coverage are calculated automatically; the user does not need to subtract areas manually.

Calculated open ground47,120 SF
Total impervious area40,000 SF
Impervious coverage45.9%

Physical site conditions

Existing living-infrastructure inventory (optional)

Enter known installed quantities. These assets are credited before new capital is optimized, preventing duplicate recommendations.

Water source and infrastructure

Green Living Tech designs and provides the irrigation and distribution system. Identify the dependable source of water available to supply that system.

Step 3 of 5

Performance objectives

WEIGHTED_OUTCOMES

Set the relative importance of each outcome. You may also define an explicit performance target. Existing objective weights remain available as migration inputs and are normalized to 100% for the current optimization engine.

Define explicit Return on Investment target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit Stormwater Performance target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit Energy Performance target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit Heat-Island Reduction target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit Biodiversity target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit Carbon Performance target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit Water Efficiency target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit Climate Resilience target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit ESG / Certification target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit Occupant Wellness target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Define explicit Asset Value target (optional)

If left blank, the legacy weight becomes a clearly labeled concept-stage planning target. Entering 0 creates an explicit zero target.

Step 4 of 5

Capital and delivery constraints

OWNER_CONSTRAINTS

Define the limits that separate the recommended owner scenario from maximum site potential.

Preliminary capital planning basis $2,000,000 Uses the owner budget when provided; otherwise the engine develops a concept-level planning allowance.

Water and operational requirements

Owner and regulatory direction

Step 5 of 5

Review the engineering brief

READY_TO_ANALYZE

Confirm the project inputs before the platform screens technologies and generates the three decision scenarios.

Project

Untitled project

Location not entered
Owner budget$0
Project context
Site opportunity
Priority outcomes
Owner constraints
Decision engine ready

Generate the Living Infrastructure Report

Technology screening, weighted scoring, budget optimization, scenario generation, lifecycle economics, and AI engineering explanations.